THINK SAFETY. WORK SAFELY.
NISSI is Staffed by Engineering Professionals & proved expertise by providing Quality services with Safety measures to the clients.
The way we work
- NISSI Energy was started on September 2013 by young energetic and experienced professionals.
- Experienced in Design, Erection, Testing and commissioning of Electrical HT/LT equipment, Control Relay Panel, Numerical relays and sub-station automation.
- Experienced in providing engineering services related to SCADA & IED integration, sub-station design and Automation.
- Destined to achieve year-over-year improvement in safety performance with our “Will to Nil” safety policy
- Aimed to the destination called “NIL” – zero safety incidents, zero injuries and zero days off work due to injury.
Our Services
147
Completed Projects
75
Qualified Engineers
117+
Work Facilities
9+
Worldwide Branches
Our Projects
Our start to finish solutions
Integration of IEDs with SCADA/DCS
- SAS Commissioning at 765kV PGCIL Lucknow, UP – ALSTOM
- SAS Commissioning at 400kV PGCIL Bina, MP – ALSTOM
- SAS Commissioning at 765kV PGCIL Sujalpur Substation, MP – ALSTOM
- SAS Commissioning at 400kV MSETCL Phultan, MH – ALSTOM
- SAS Commissioning at 400kV MSETCL Lonikand-2, MH – ALSTOM
- Integration of Micom IED’s With max DNA SCADA,40*3 MW, HYDRO, SEWA – ALSTOM
- Integration of Micom IED’s With Honeywell SCADA, MHS- ONGC, OFFSHORE MUMBAI – ALSTOM
- Integration of Micom IED’s With Yokogawa SCADA,11/6.6kV Oil boosting plant, IOTL, Viramgram – ALSTOM
- C264 EL Commissioning at Southern PGCIL Sites (7 Nos.) – ALSTOM
- M871 DR’s Commissioning at NTPC FARIDABAD – ALSTOM
- S900 EL Commissioning at PGCIL- HOSUR, KOLAR, ROURKELA – ALSTOM
SCADA
- New Delhi – BSES SCADA Adaptation – ABB
- Patna, Bihar – PESU SCADA Adaptation – ABB
- New Delhi – NDMC SCADA Project – ABB
- Karnataka – KPTCL IES SCADA Engineering and Adaptation – ABB
- Maharashtra State EB Signal Monitoring System in 400kV Sub-stations – SIEMENS
- MSETCL SCADA Project – SIEMENS
- IOCL – MATURA SCADA Adaptation – HONEYWELL
Overseas
- East Timor – Testing & Commissioning- 150kV Hera S/stn. – ABB Singapore
- East Timor – Substation Automation of 150kV Hera S/stn. – ABB Singapore
- Bangladesh – 132kV Bay Commissioning – ABB Singapore
- Bangladesh – NLDC Project RTU Testing of 220/132kV S/stn. – ALSTOM India
- Ethiopia – Commissioning of ABB RTU – ALSTOM India
- Bhutan – NLDC Project RTU Testing of 220/132kV S/stn. – ALSTOM India
- Fiji – Testing & Commissioning – 132kV S/stn. – EPC Ltd Australia
Testing and Commissioning
- Delhi International Airport Ltd (DIAL)
- 8 X 135 MW TPP, Raj West Power Ltd., Barmer
- 2 X 150 MW TPP, Simhapuri Energy Pvt Ltd., Gudur
- 2 X 300 MW Power Plant, JSW Energy Ltd., Bellary
- Chanderia Lead Zinc Smelter (1 X 80 MW Captive Power Plant)
- 1 X 43 MW CAPTIVE POWER PLANT, Welspun India, Gujarat
- Factory testing for ABB MNS panels
- LT panel commissioning – ABB MNS System
Engineering Services
- 400 KV PIRANA SUB-STATION (NEW) – PGCIL
- 400 KV TIRORA TPP – ADANI POWER MAHARASHTRA LIMITED
- 220/66 KV KANGASHIALI SUBSTATION – GETCO
- 400 KV, 2 X 300 MW EMCO ENERGY TPP AT WARORA – GMR – EMCO ENERGY LTD
- 765/400 KV SUBSTATION AT ANPARA-D – UPPTCL
- 765/400 KV SASARAM (NEW) – PGCIL
- 765/400/220 KV BHIWANI SUBSTATION (PACKAGE-S4) – PGCIL
- 400/220 KV GIS HAZIRA SUBSTATION – ESSAR POWER TRANSMISSION CO. LTD
- 220/66 KV LUNAWADA SUBSTATION) – GETCO
EBOP Power Plant Engineering
- 2 X 300 MW EMCO ENERGY TPP AT WARORA – GMR – EMCO ENERGY LTD
Retrofit
- New Delhi – BSES SCADA Adaptation – ABB
- 400 KV OBRA Substation – UPPTCL – SIEMENS
- 400 KV A Substation – UPPTCL – SIEMENS
- 400 KV SULTANPUR Substation – UPPTCL – SIEMENS
- 400 KV SARNATH Substation – UPPTCL – SIEMENS
- 400 KV PANKI Substation – UPPTCL – SIEMENS
- 400 KV Koradi, Chandrapur & Khaperkeda Substation TPP – MSETCL – SIEMENS
- 22/11 KV BEST Substations at Mumbai – ALSTOM/Schneider