SCADA Adaptation
Monitoring Existing substation by collecting Input , output ,Analog data points from the field Via RTU / Gateway . Establishing Control & monitoring of various main station & substation from the centralised location to improve the quality & stability of the power system. To achieve this Existing old station getting upgraded by installation of RTU, Local monitoring system , DCPS & Battery for the New RTU panels. Interconnecting Field signals with RTU & transmitting the same to Master control center New SCADA system getting online.
- Preparation of engineering documents such as SLD, control room Layout, BOM and I/O List, cable schedule and adaptation schedule, as-built drawings in PDF / CAD format.
- Panel Erection, Cable laying and Termination for existing sub-station and new sub-stations.
- Configuration, Testing and commissioning of RTU and obtaining SAT certificate from customer.